Medium • €€ • Tiles → green

Courtyard Retrofit

Lift tiles, install engineered soil and planting, and route roof overflow into the new bed with an underdrain.

Overview

Lift tiles, install engineered soil and planting, and route roof overflow into the new bed with an underdrain.

Medium€€Tiles to greenGreat for shared courtyards
Materials
  • Shovel, pry bar
  • Engineered soil (sand/compost mix)
  • Geotextile (optional)
  • Plant palette (shade/sun adapted)
  • Underdrain to safe outlet
Tools
  • Spade, wheelbarrow
  • Level, string line
  • Pruners, rake
Safety & Risks
  • Maintain accessible paths and fire egress widths.
  • Avoid burying utilities or inspection points.
Maintenance
  • Weed monthly in first season.
  • Top up mulch annually; adjust grading if settlement occurs.
Permits / Notes
  • Check heritage/condo rules for visible courtyard changes.
Steps
  1. Map roof drains; identify safe overflow path.
  2. Lift tiles; decompact subgrade lightly.
  3. Install underdrain (if needed) and backfill with soil mix.
  4. Plant in zones; add mulch.
  5. Connect roof overflow to the bed via splash block or pipe.
  6. Water and monitor after first storm.