Pro • €€€ • Big buffer

Cistern / Storage (buried)

An underground tank with a controlled outlet for sites where above-ground space is limited and excavation is possible.

Overview

An underground tank with a controlled outlet for sites where above-ground space is limited and excavation is possible.

Pro / Contractor€€€Large storageExcavation access needed
Materials
  • Poly or concrete cistern (size per design)
  • Inlet/outlet fittings + inspection riser
  • Backfill (sand/gravel) and bedding
  • Overflow to storm or soakaway
  • Optional: pump and filter
Tools
  • Excavator, shoring (as required)
  • Compactor, levels
  • Pipe saws, solvent cement (for PVC)
Safety & Risks
  • Trench safety and shoring required for deep excavations.
  • Confined space rules for tank entry.
  • Call utility locate before digging.
Maintenance
  • Inspect screens and first-flush devices quarterly.
  • Pump out sediment as needed; test pump annually.
Permits / Notes
  • Building permit and storm connection approval usually required.
  • Check groundwater table and buoyancy calculations.
Steps
  1. Engineering design for volume, buoyancy, and loads.
  2. Excavate and prepare level bedding; set tank per manufacturer.
  3. Connect inlet, outlet, and overflow; add inspection riser.
  4. Backfill in lifts with compaction; protect pipes.
  5. Install pump/filter if using water for irrigation.
  6. Commission, leak check, and restore surface.